Two-Part Tool Storage Chest on Wheels - Black/Red

Regular price £144.89
Sale price £144.89 Regular price £176.39
Unit price
Save £31.50
Tax included.

Guarantee safe & secure checkout

Two-in-one storage with this tool chest on wheels. The two-part design comes with the upper carry chest and lower cupboard. Inner EVA mats protect tools and help prevent scratches on the tool storage cabinet itself. Made powder-coated steel, this is a tough piece made to work with you. Complete with wheels and a lockable bottom door.

Features:

  • The top box with side handles and bottom cabinet can be used separately. Store inside bottom cupboard when not being used
  • Cupboard door of machinist tool chest is lockable for safety, two keys included
  • Two latches to secure the top 4 drawers and case
  • Comes with five drawers, top compartment, bottom cupboard and side rack. Lots of storage!
  • Inner EVA mats absorb oil and keep tools in place
  • Four wheels to move easily. Two with brakes for safety
  • Easy to assemble

Specification:

  • Colour: Black, Red
  • Material: Steel
  • Upper Chest Dimension: 45L x 24W x 33Hcm
  • Bottom Cabinet Dimension: 60L x 28W x 72Hcm
  • Top Storage Size (upper chest): 45W x 23D x 5Hcm
  • Drawer Size (upper chest): 38W x 20D x 4Hcm
  • Drawer Size (lower cabinet): 45W x 24D x 7.5Hcm
  • Cabinet Interior Size: 52W x 28D x 45Hcm
  • Side Rack Size: 25.4W x 7D x 6.6Hcm
  • Weight capacity: 50kg (upper chest), 130kg(bottom cabinet), 10kg(drawer), 30kg(cabinet interior)
  • Item Label: B20-105V00MX

Package Includes:

  • 1 x Top Tool Chest
  • 1 x Rolling Cabinet
  • 2 x Key
  • 1 x Manual
Two-Part Tool Storage Chest on Wheels - Black/Red

Two-Part Tool Storage Chest on Wheels - Black/Red

Regular price £144.89
Sale price £144.89 Regular price £176.39
Unit price

Why Minicrafted?

Free Delivery on all orders

Enjoy a seamless shopping experience.

Customers Services

Our dedicated team committed to addressing any querie.

Secure Checkout

Worry-free shopping with our secure checkout process.

Inspired by your visits

Recently Viewed Products

Shop by collections